Principal Engineer

Presentation

L04 Project Status Update

A review of project L04 mid-way status 06/26/2012

Learn More
Presentation

Project L04 Technical Coordinating Committee Presentation

This presentation, titled "Incorporating Reliability Performance Measures in Operations and Planning Modeling Tools ", was performed in Irvine on April 8, 2010.

Agenda:

 

- Project Overview – Methodology

- Data and Candidate Networks

- Antici

Learn More
Background Material

L04 Amplified Work Plan

This document is an amplified work plan for the SHRP 2 Project L-04 and provides a detailed description of how the research plan will be carried out by the team members.

Learn More
Software Tool

Project L04 Technical Reference Material

This document represents the assembly of two key pieces of investigation that provide additional detail to support the project findings summarized in the Final Report. The two reports included under the Reference Material cover include:

 Task 7 - Simulation Model Adaptation and Dev

Learn More
Software Tool

Scenario Manager Inputs

GIS inputs for the project L04 scenario manager tool.

Learn More
Software Tool

Project L04 Scenario Manager User’s Guide

The purpose of this document is to describe the use of the Scenario Manager developed as part of the Strategic Highway Research Program SHRP2 L04 project titled “Incorporating Reliability Performance Measures in Operations and Planning Modeling Tools”. The purpose and role of the Scenario Manager

Learn More
Software Tool

L04 Trajectory Processor User’s Guide

The Trajectory Processor is an essential part of the analytical framework developed under the SHRP2 L04 project to produce travel time reliability performance measures from planning and simulation model outputs. It calculates and visualizes travel time distributions and ssociated reliability indi

Learn More
Standards & Recommended Practices

Project L03 Final Report

The fundamental objective of SHRP 2 Project L03 was to develop predictive relationships between highway improvements and travel time reliability. In other words, how can the effect of an improvement on reliability be predicted? Alternatively, how can reliability be characterized as a function of

Learn More
Presentation

L03 Poster Presentation

An at-a-glance overview of the L03 Project.

Learn More
Presentation

Predicting Travel Time Reliability: Methods and Implications for Practice

An overview of project L03's process and findings.

Learn More