L01 Poster
An overview of the SHRP2 L01 project presented at the TRB annual meeting
Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)
An overview of the SHRP2 L01 project presented at the TRB annual meeting
Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)
A presentation reviewing the L01 project methods and products.
Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)
This Amplified Work Plan provides an overview of the approach to the research and documentation to fulfill the specifications for the Reliability L01, Integrating Business Processes to Improve Travel Time Reliability.
Related Artifacts: SHRP2-L01 Request for Proposals
Guide to Integrating Business Processes to Improve Travel Time Reliability
Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)
Adapting the Project L03 Methods for Sketch Planning: the C11 tool.
Project C11: Economic Analysis Tools - Reliability Module Prepared by Cambridge Systematics & Weris Inc. April 2014
Related Artifacts: C11 Reliability User’s Guide; Project C11 Final Report
While the Transportation Project Impact Case Studies (T-PICS) screening tool developed in SHRP 2 Project C03 portrays the general range of economic impacts associated with various transportation projects, most agencies also move on to examine the specific changes in transportation conditions asso
The document contains the work plan for Project C11: "Development of Improved Economic Analysis Tools Based on Recommendations from Project C03"
Related Artifacts: SHRP2-C11 Request for Proposals
The Reliability Module is one of the economic analysis tools developed from SHRP 2 Project C11. It is a sketch planning corridor spreadsheet tool based on SHRP 2 Reliability Project L03 research that estimates the benefits of improving travel time reliability for use in benefit/cost analysis. Loc
SHRP2-C11 Technical guide