Principal Engineer

Informational Product

L01 Poster

An overview of the SHRP2 L01 project presented at the TRB annual meeting

Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)

Learn More
Presentation

Implementation Workshop Presentation

A presentation reviewing the L01 project methods and products.

Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)

Learn More
Background Material

L01 Amplified Work Plan

This Amplified Work Plan provides an overview of the approach to the research and documentation to fulfill the specifications for the Reliability L01, Integrating Business Processes to Improve Travel Time Reliability.

Related Artifacts: SHRP2-L01 Request for Proposals

Learn More
Standards & Recommended Practices

L01 Final Guide

Guide to Integrating Business Processes to Improve Travel Time Reliability

Related Artifacts: Project L34 e-Tool (Java), Project L34 e-Tool (Windows 7), Project L34 e-Tool (Windows XP and Vista)

Learn More
Presentation

C11 Presentation

Adapting the Project L03 Methods for Sketch Planning: the C11 tool.

Learn More
Software Tool

Project C11 – Reliability Module

Project C11: Economic Analysis Tools - Reliability Module Prepared by Cambridge Systematics & Weris Inc. April 2014

Related Artifacts: C11 Reliability User’s Guide; Project C11 Final Report

Learn More
Research

Project C11 Final Report

While the Transportation Project Impact Case Studies (T-PICS) screening tool developed in SHRP 2 Project C03 portrays the general range of economic impacts associated with various transportation projects, most agencies also move on to examine the specific changes in transportation conditions asso

Learn More
Background Material

C11 Amplified Work Plan

The document contains the work plan for Project C11: "Development of Improved Economic Analysis Tools Based on Recommendations from Project C03"

Related Artifacts: SHRP2-C11 Request for Proposals

Learn More
Software Tool

C11 Reliability User’s Guide

The Reliability Module is one of the economic analysis tools developed from SHRP 2 Project C11. It is a sketch planning corridor spreadsheet tool based on SHRP 2 Reliability Project L03 research that estimates the benefits of improving travel time reliability for use in benefit/cost analysis. Loc

Learn More
Software Tool

C11 Reliability Technical Documentation

SHRP2-C11 Technical guide

Learn More