Appendix B – Supporting Technical Memoranda

Overview

Appendix B of the Project C04 final report is a collection of technical memoranda. It is organized as follows:

  • B1 PSRC Traffic Choice Study Data Review And Completed Processing Tasks Appendix
  • B2 Processing Of Traffic Choices GPS Data to Provide Measures of Travel Time Variability for SHRP 2 C04 Appendix
  • B3 Possible Uses for the Puget Sound Traffic Choice Study Data in the SHRP 2 C04 Project Appendix
  • B4 Mathematical Formulations of the Integrated Multidimensional Network Choice Model Appendix
  • B5 Solution Algorithms for the Integrated Multidimensional Network Choice Model Appendix
  • B6 Calibration Of Time‐Dependent Of Demand With Multiple Vehicle Types

Operations Area of Practice

    SHRP2 Tools
    Travel Demand Forecasting

Content Type

Research

Role in Organization

Transportation Planner
Public
Senior Engineer
Researcher/Academic
Principal Engineer
Manager / First Line Supervisor
Director / Program Manager
CEO / GM / Commissioner
Engineer
Senior Manager
Transit Professional
Associate Engineer

Publishing Organization

SHRP2 Program

Document Downloads

TOM Chapters
6.5
View Related
Issue Date