Publications Search Results

Background Material

Project L38A Amplified Work Plan

This amplified work plan, titled "Pilot Testing of SHRP 2 Reliability Data and Analytical Products", outlines the System Metrics Group team's approach to testing SHRP2 projects on the Southern California test site.

Learn More
Presentation

Southern California Pilot Site

An overview of results from the I-210 pilot study testing the methods from projects L02, L05, L07, L08, and C11.

Learn More
Informational Product

L38A Poster Session (TRB Annual Meeting 2014)

A poster displaying the process and findings of project L13.

Learn More
Research

Project L38A Final Report

Project L38 tested the Second Strategic Highway Research Program (SHRP 2) reliability analytical products at four pilot sites. This report provides findings from the Southern California site, which used a reliability guide from L02, analysis tools for forecasting reliability and estimating impact

Learn More
Presentation

L38B Webinar

SHRP 2 Project L38 Pilot Testing of Reliability Data and Analytical Products Pre-Kickoff Webinar March 13, 2013 Minnesota Department of Transportation

Learn More
Background Material

Project L38B Amplified Work Plan

This amplified work plan for Project L38B, titled "Pilot Testing of Reliability Data and Analytical Tools", outlines the MnDOT team's effort to conducting the pilot testing for the Minnesota pilot site.

Learn More
Software Tool

TH 100 NB Year 2012 Sample Results

This presentation documents results from the analysis of density and VMT data from TH 100 in Minnesota. The exact extent of the TH 100 NB study segment is from 77th Street (S375) to 57th Avenue (S1614), a distance of approximately 14.6 miles.

Learn More
Informational Product

Project L38B TRB Poster

This poster was used by the Project L38B team to present their findings at TRB 2014.

Learn More
Presentation

Project L38B Progress Update Presentation #2

This presentation was conducted on September 16, 2013 by the Minnesota DOT and SRF Consulting and served as the second progress update on the project.

Learn More
Presentation

Project L38B Oversight Committee Presentation

This presentation was conducted on December 9, 2013 by the Minnesota DOT and SRF Consulting for the project's Oversight Committee meeting.
Learn More