Overview
Transportation systems management and operations (TSM&O) strategies can improve travel time reliability, which yields both safety and economic benefits and improves road-user experience. To date, only a few transportation agencies have TSM&O programs to address travel time reliability, but a common understanding of the causes of unreliable travel times and the actions that can improve reliability have the potential to make TSM&O programs more widespread. To help move TSM&O into mainstream agency practice, A Framework for Improving Travel Time Reliability (SHRP 2 Project L17) created the L17 Knowledge Transfer System, a web-based tool designed to provide convenient one-stop access to the complete range of existing and new TSM&O information. The KTS tool will be available for public use in a few months.This tool integrates products from SHRP 2 Reliability research projects and other sources of TSM&O information, and it provides an umbrella structure for incorporating the many individual elements of TSM&O. The final report describes the creation of the L17 Knowledge Transfer System, research about TSM&O, and branding and communication strategies for the web tool.
TRB’s second Strategic Highway Research Program (SHRP 2) Reliability Project L17 has released a has released a prepublication, non-edited version of a report titled A Framework for Improving Travel Time Reliability that describes the results of a project designed to identify and enhance the dissemination of transportation systems management and operations (TSM&O) information.
Source Organization Location
Washington, DC
Operations Area of Practice
- Communicating Reliability Information
- Cost / Benefit Analysis
Organizational Capability Element
- Economic Analysis of Reliability/Costs and Benefits
Content Type
- Research
Role in Organization
- Director / Program Manager
- Media / PIO
- Principal Engineer
- Researcher/Academic
- Senior Engineer
- Senior Manager
- Transportation Planner
Publishing Organization
- SHRP2 Program
Maturity Level of Program
- Assessment (L1)
- Deployment (L3)
- Development (L2)
- Monitoring (L4)
Objective
- Available Tools
Document Downloads
-
SHRP2_S2-L17-RW-1.pdf (36.04 MB)
-
SHRP2_S2-L17-RW-1 Summary.pdf (4.19 MB)