Delivering resources to save time, lives, and money

Work Zone Safety and Mobility Rule for Design-Build Projects Successes, Challenges, and Tips

Overview

Research was conducted to explore and identify the issues with and approaches to applying the Rule to design-build projects and how this affects the project development process. In-depth research was done through two case study sites to further examine the issues and identify successes, challenges, and tips. This leaflet summarizes the key points and uses the two case studies to illustrate successes and challenges.

Source Organization Location

Washington
,
DC

Operations Area of Practice

    Active Traffic Management (ATM)
    Transit Operations
    Strategic Planning
    Work Zone Management

Organizational Capability Element

    Project Development
    Performance Management
    Freeway Operations
    Work Zone Management
    Technical Understanding

Content Type

Informational Product

Role in Organization

Transportation Planner
Public
Senior Engineer
Researcher/Academic
Principal Engineer
Manager / First Line Supervisor
Director / Program Manager
Maintenance Staff
Technician
CEO / GM / Commissioner
Engineer
Operator
Senior Manager
Public Safety Officer
Transit Professional
Associate Engineer
Media / PIO

Publishing Organization

FHWA

Objective

Learning
How-To

Document Downloads

TOM Chapters
15.1
24.1
20.4
View Related
Issue Date
Publication Number
FHWA-HOP-13-026