Delivering resources to save time, lives, and money

SR 520 Westbound Ramp Meter Effects

Overview

This report is a summary of the effect of ramp metering on traffic in 2 separate locations of Westbound SR 520, in terms of volumes and speeds. The data were collected 1 year apart in the same location, in order to be as accurate as possible. The results are outlined in this report, accompanied by tables and graphs to visualize the data. The results are separated into AM and PM results, reporting on speeds, mainline volumes, ramp volumes, and congestion.

 

 

 

 

Operations Area of Practice

    Access Management
    Corridor and Arterial Traffic Management
    Freeway Management
    Ramp Metering
    Integrated ITS Deployment
    Real Time Traveler Information
    Decision Criteria for ITS Device Type and Location
    Customer Request Management

Organizational Capability Element

    Project Systems Engineering
    Traveler Information
    Testing, Verification & Validation (V&V)
    Arterial Traffic Control Device Operations

Content Type

Case Studies & Lessons Learned

Role in Organization

Transportation Planner
Senior Engineer
Researcher/Academic
Manager / First Line Supervisor
Director / Program Manager
Engineer
Senior Manager

Publishing Organization

State DOTs

Document Downloads

Author
Paul Neel,
Jason Gibbens
TOM Chapters
22.1
19.2
View Related
Issue Date