North/West Passage TPF Study Work Plan: Phase 4

Overview

This document is a report on the projects accomplished in phase 1 of the Work Plan. The purpose of the projects in Phase 4 is to continue to integrate traveler information systems and coordinate maintenance operations across state borders. These projects included a continuation on the Traveler Information website, an evaluation of Cross Border Information Requests, a communication of the concept of operations, a corridor-wide oversize/overweight permitting, and expanded corridor-wide truck parking facilities. Details of each project are outlined in this document.

 

 

 

Operations Area of Practice

    Corridor and Arterial Traffic Management
    Freeway Management
    Integrated ITS Deployment
    Communications
    Real Time Traveler Information
    ITS standards and specifications
    Systems engineering
    Decision Criteria for ITS Device Type and Location
    ITS System architecture
    Interagency Agreements / Cooperation / MOUs
    Business Processes/Policies and Procedures
    Data Acquisition, Support and Hosting
    Cost / Benefit Analysis
    Decision Criteria for ITS Device Type and Location
    Municipal Operations

Organizational Capability Element

    Integrated Corridor Management
    Standards and Interoperability
    Freeway Operations
    Project Systems Engineering
    Traveler Information
    Regional Architectures
    Testing, Verification & Validation (V&V)
    Local government/MPO/RTPA cooperation

Content Type

Informational Product

Role in Organization

Transportation Planner
Public
Senior Engineer
Principal Engineer
Manager / First Line Supervisor
Director / Program Manager
Maintenance Staff
Technician
Engineer
Operator
Senior Manager

Publishing Organization

Other Research Organizations

Document Downloads

TOM Chapters
24.3
19.2
15.6
6.5
8.3
8.4
29.1
View Related
Issue Date
Publication Number
TPF-5(093)