AASHTO TSM&O Guidance: Culture Dimension

AASHTO

Overview

These three documents are guidance on improving agency capability in TSM&O with respect to the culture dimension, as developed through NCHRP 03-94 and SHRP2 L06, available in this database. Culture is defined as “the combination of values, assumptions, knowledge and expectations of the agency in the context of its institutional and operating context, and expressed in its accepted mission and related activities.” The three documents represent specific guidance on culture in the form of improvement targets, strategies, and key actions for agency advancement in capability from “performed” to “managed” (Level 1 to 2), “managed” to “integrated” (Level 2 to 3), and “integrated” to “optimized” (Level 3 to 4). The guidance covers four key sub-dimensions of culture: business case, leadership/championship, outreach, and program status/authorities. Agency examples and reference documents are also provided for each level change.

Source Organization Location

Washington, DC


Operations Area of Practice

  • Business Processes/Policies and Procedures
  • Communicating Reliability Information
  • Interagency Agreements / Cooperation / MOUs
  • Leadership
  • Performance Management
  • Tools for Small Agencies
  • TSMO Culture

Organizational Capability Element

  • Planning
  • Performance Measurement
  • Leadership/Championship
  • Outreach & Marketing
  • Program Status/Authorities
  • Technical Understanding
  • Local government/MPO/RTPA cooperation

Content Type

  • Informational Product

Role in Organization

  • CEO / GM / Commissioner
  • Director / Program Manager
  • Engineer
  • Manager / First Line Supervisor
  • Principal Engineer
  • Researcher/Academic
  • Senior Engineer
  • Senior Manager
  • Transit Professional
  • Transportation Planner

Publishing Organization

  • AASHTO

Maturity Level of Program

  • Assessment (L1)
  • Deployment (L3)
  • Development (L2)
  • Monitoring (L4)

Objective

  • Available Tools
  • Prioritization

Document Downloads

Project Website

AASHTO TSM&O Guidance

Prime Contractor
_____________________
Issue Date
December 31st, 2010
Downloads Back to Search Results