Twin Cities Metro Area Ramp Meter Study

Minnesota DOT

Overview

The purpose of this study was to determine the effects that ramp metering had within the Twin Cities metro area. 430 ramp meters were to be shut down for six weeks, so data was collected for five weeks before they were turned off. Objectives of this study included examining how ramp metering affected freeways, local roads, and transit operations; gathering the public perception of ramp metering; and comparing Minnesota's ramp metering system with other systems across the country.

The results showed a decrease in freeway volume and freeway speeds, and an increase in freeway travel times and crashes. When the public attitude was examined, it was determined that most people thought traffic was worse, and more people supported the ramp meters. As a result, MnDOT launched a new ramp meter timing system in order to meet the consumer's wants -- reduce delays, crashes, and congestion; provide travelers with more reliable travel times; and manage ramp meter wait times. The new system is also adaptable to congestion and other factors.


Operations Area of Practice

  • Access Management
  • Corridor and Arterial Traffic Management
  • Freeway Management
  • Ramp Metering
  • Traffic Signal Timing
  • Travel Demand Management
  • Detection Systems
  • Integrated ITS Deployment
  • ITS standards and specifications
  • Systems engineering
  • Business Processes/Policies and Procedures
  • Customer Request Management
  • Cost / Benefit Analysis
  • Decision Criteria for ITS Device Type and Location
  • System Performance Definition, Monitoring and Reporting
  • Traffic Impact Assessment
  • Travel Demand Forecasting

Organizational Capability Element

  • Asset Management
  • Performance Management
  • Evaluation of Operations Strategies
  • Performance Measurement
  • Active Traffic Management/Travel Demand Management/Pricing
  • Arterial Traffic Control Device Operations
  • Freeway Operations
  • Integrated Corridor Management
  • Project Systems Engineering
  • Testing, Verification & Validation (V&V)

Content Type

  • Case Studies & Lessons Learned

Role in Organization

  • CEO / GM / Commissioner
  • Director / Program Manager
  • Engineer
  • Manager / First Line Supervisor
  • Principal Engineer
  • Researcher/Academic
  • Senior Engineer
  • Transportation Planner

Publishing Organization

  • State DOTs

Document Downloads

Project Website

Twin Cities Metro Area Ramp Meter Study

Issue Date
May 13th, 2002
Downloads Back to Search Results